With support from Dameng’s database, the system’s core performance indicators improved more than 10 fold, achieving stable operation for over 10 years, and were applied to national dispatching, the five major grids, and dispatching in 21 provinces and over 100 regions.
Dameng’s database going online was a breakthrough in terms of smart grid key technology and met all the requirements for a smart grid dispatching technical support system. The database’s performance and the system’s operating speed, reliability and security greatly exceeded service expectations, with the system’s core performance indicators improving more than 10 fold, guaranteeing the grid’s secure, reliable, high-quality and economic operation. To date, 80% of the online State Grid D5000 system uses Dameng’s database and it is also used in the State Grids dispatching control center, dispatching and control in the five major grids (East China Power Grid, Central China Power Grid, Northeast China Power Grid, Northwest China Power Grid and Southwest China Power Grid) and dispatching in 21 provinces and over 100 regions.